In July 2016, BSRIA published BG65/2016 Floor Plenum Airtightness – Guidance and Testing Methodology. This replaced BG 12/2010 Floor Void Airtightness – Air Leakage Specification,
Since the introduction of airtightness testing as part of the Building Regulations, the air leakage of buildings has steadily reduced as construction teams have become more familiar with the requirements. By introducing lower specifications for floor plenums, it is hoped that the effect will be similar.
A floor plenum is a void between a building’s floor structure and a raised access floor, used for distributing conditioned air to the spaces above.
It is important that conditioned air in a floor plenum flows into the occupied zone and does not leak into cavities, risers, stairwells, heating trenches or other adjacent zones. A properly sealed floor plenum will allow the diffusers and grilles to fulfill their primary role of delivering air at the correct flow rate. As a result, the airtightness of floor plenums can be a serious energy efficiency issue.
BSRIA’s new guide addresses these issues and places upper limits on the air leakage of floor plenums. Distinctions are made between air leakage to adjacent spaces (normally referred to as plenum leakage), and uncontrolled air leakage into conditioned zones (normally referred to as raised access floor leakage). A testing methodology for both plenum leakage and raised access floor leakage is given, and guidance on achieving both is provided.
To download or purchase the guide, go to the BSRIA Bookshop.
N.B. This guide replaces BG 12/2010 Floor Void Airtightness – Air Leakage Specification, which was withdrawn.
--BSRIA
[edit] Related articles on Designing Buildings Wiki
- Air tightness in buildings.
- Airtightness of energy efficient buildings.
- BSRIA articles on Designing Buildings Wiki.
- Building performance evaluation.
- Closing the gap between design and as-built performance.
- Draughts in buildings.
- Energy Performance Certificates.
- Indoor air quality.
- Performance gap.
- Plenum ventilation in buildings.
- Thermographic survey.
- The history of non-domestic air tightness testing.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Gasholders: a history in pictures. Book review.
Recognition, influence and growth
SocEnv identifies three strategic pillars in new strategy to 2045.
Discover the future of roofing, cladding and insulation.
New guidance for professional practice, cultural change and regulation in social housing.
The heritage of nuclear and conventional power stations.
New measures to stop people being ripped off
Government to protect families from cowboy builders and aggressive bailiffs.
New Futurebuild showcase brings an innovation-first approach.
National Planning Policy Framework
Understanding the 2026 changes.
ECA's public affairs priorities
Member consultation opens to shape priorities for 2027 to 2030.
Dutyholder responsibilities from 1 July 2026.
Where performance meets practice
The Building Envelope Stage at UKCW Birmingham.
CIAT publishes briefing on planning reforms.